Closed on property Sept. 19 (national talk like a pirate day)
Demolition began Dec. 16.
Here's proof! Instead of before/after pics, I am presenting before/during pics.
Here's the gnome kitchen... I can't believe it actually looks SMALLER with the cabinets and everything out of the room.
Here's the main room (1). Home Depot decided to deliver all of the materials BEFORE demolition commenced. Brilliant! (so f'ing stupid I can't begin to tell you.)
And now, for the grand finale! The haz mat room known as the bathroom!
Not in this case. The shower handles were installed DIRECTLY above the bathtub handles. Whatever.
So the pipes are in pretty bad shape, but that's all part of the job as far as I'm concerned.
The contractor told me he has 2 full crews on the job until it's done, because the job's been so botched up from the start. That's nice to hear, but I don't believe it for a second. Although last Wednesday, I stopped by around 10pm and the plumber and one assistant were still there, fixing a "big problem" with the new bathtub. I didn't even ask what the problem was. (But to be fair to me, I *did* go get them Starbucks venti's and sammys.)
I have to price new windows and kitchen appliances and I feel what's left of my money slipping away, but somewhere deep down, lurking, is the start of some excitement! Quickly overwhelmed by a feeling of dread that my beloved bedroom furniture (which is black) will blend right into the espresso flooring.
later